From idea to reality

Based on the findings from a Front End Engineering Design Report from 2005, it is possible to conclude that the technical requirements for a wave energy plant in the Faroe Islands do not pose an obstacle to realizing the project. Likewise, the report shows, how a wave energy plant may be built at Nípan in Vágar as a preferred site and Søltuvík in Sandoy as an alternative site.

A demonstraton plant named Project ALDA has obtained EU grant as well aslocal support and is planned to be in operation from 2011.

Contact
SeWave Ltd.
Landavegur 92
BOX 195
FO-110 Torshavn
Tel: (+298) 31 10 86
Mobile: (+298) 22 39 78
ogsewave.fo

The wave motions outside the cliff face push the water into the tunnel-chamber, creating the function of a stamp for the air, which is pressured and pulled through a turbine.

From idea to reality

Based on the findings from a Front End Engineering Design Report from 2005, it is po... Read more

 
SeWave Ltd., Landavegur 92, Box 195, 110 Tórshavn, Tel: (+298) 31 10 86, Mobile: (+298) 22 39 78, ogsewave.fo
Developed, programmed and designed by Sansir